The reliability requirement
Onshore and offshore cables encounter different loading and ageing conditions. The study identified failure mechanisms and connected risks with design and maintenance actions.
Analysis and prioritisation
Root-cause and fracture-surface analysis were combined with accelerated ageing data. Weibull models described failure-time scatter and an Arrhenius approach investigated thermal acceleration.
FMEA ranked failure modes. Findings supported design recommendations and inspection intervals defined around reliability targets.
Reported outcomes
The study distinguishes dominant mechanisms in onshore and offshore applications, including hydrothermal ageing and termination corrosion offshore.
Life-distribution fits and FMEA informed modification priorities and differentiated inspection schedules. Extrapolation from accelerated testing depends on the study assumptions and confidence levels.
What this case demonstrates
Reliability work connects failure diagnosis with preventive tasks and design changes. Equipment histories and criticality provide a basis for choosing actions.
Methods for your project in Morocco.
Explore the related services and discuss the scope suited to your equipment.
Preventive maintenancePredictive maintenanceCorrective maintenance



